Decision brief: open course materials service
A bounded pilot and evidence-based expansion decision
This illustrative brief considers a university service for open course materials. It connects the need, alternatives, staffing estimate, risks, and a 16-week pilot to explicit measures for a later expansion decision. Names and quantities are planning assumptions, not field results.
The decision in one page
Faculty need a dependable way to publish course materials, identify the approved version, and collect corrections. This brief proposes a limited 16-week pilot in two courses. Expansion would follow only if access, editorial quality, rights, and maintenance meet the gates in Table 4. The options in Table 2 keep this a choice rather than an assumed purchase.
Approve ten learning units across two courses, one maintained source for each unit, a Word review step, and a PDF release. Do not approve an institution-wide platform or a permanent staffing commitment at this stage.
Scope of the approval
The pilot covers a small publication process, not a new learning-management system. A course owner supplies text and rights information. An editor checks structure and accessibility. A reviewer comments in Word. The source owner accepts changes in the structured source, rebuilds, and records the release.
Assumptions and boundaries
The university, courses, and volumes are fictional. Staff hours below are planning estimates, not market prices. The brief assumes that the institution already has course pages and that it may publish the selected materials. If either condition fails, the option comparison must be revisited.1
Problem and reader journey
Materials currently move through email, course folders, and isolated documents. A student may find an outdated PDF while an instructor holds a corrected Word file. A diagram may be replaced without updating its text alternative. The service must make the approved version visible and keep corrections connected to the maintained source.
Student and instructor paths
A student opens a course page, sees the title, version, and approval date, and downloads the reading copy. An instructor starts from a structured source, hands a Word file to a reviewer, decides which comments to accept, and publishes a new PDF. The two paths share one version identifier.
| Reader need | Current failure | Pilot response |
|---|---|---|
| Find the approved copy | Several files have similar names | Version and date on each release |
| Read on common devices | An editable draft becomes the reading copy | PDF as the primary published format |
| Correct a mistake | Change stays in a returned Word file | Reconcile it into the source |
| Reuse a figure | Image lacks a useful description | Store alt text beside the figure source |
Options and decision criteria
The team compared three small approaches. Scores run from 1 (poor fit) to 5 (strong fit). The weights express this pilot’s priorities; they are not a general verdict on the products involved.
| Criterion | Weight | Shared files | New portal | Structured source service |
|---|---|---|---|---|
| Approved version is clear | 30 | 2 | 4 | 5 |
| Human review is easy | 25 | 4 | 3 | 5 |
| Reuse across formats | 20 | 2 | 4 | 5 |
| Setup effort | 15 | 5 | 2 | 3 |
| Accessibility checks | 10 | 2 | 4 | 4 |
| Weighted score / 100 | 100 | 59 | 69 | 92 |
The structured-source approach leads under these weights because it retains the content and its evidence while still giving reviewers an editable Word document. A portal may become useful later for discovery and access control. The pilot does not need to decide that future architecture now.
What could change the choice?
If the university cannot support the publication workflow, setup effort may dominate the decision. If most materials are scans, remediation cost will rise before any tool helps. If access control is essential, the new portal option deserves another evaluation. These are explicit triggers for reassessment.
Pilot cost and ownership
The pilot asks for time from existing roles. The estimates in Table 3 are intentionally simple so a team can replace them with observed hours after the first four units.
| Work | Owner | Estimated hours | Evidence at handoff |
|---|---|---|---|
| Source preparation | Course author | 42 | Draft source and rights notes |
| Editorial and access checks | Editor | 24 | Issues resolved or assigned |
| Academic review | Instructor reviewer | 20 | Commented Word files |
| Release and verification | Publisher | 14 | PDFs and release log |
| Total | Team | 100 | Ten pilot units |
No unit is published until its author identifies ownership and the permitted reuse terms for text, tables, and images. A visually complete PDF is not proof that publication rights are clear.
Risks, measures, and gates
The team should record a baseline before changing the workflow. The pilot dashboard needs counts of requests, successful downloads, review turnaround, corrections after release, and staff hours. A measure is useful only when its definition and collection method remain stable.
| Gate | Minimum evidence | Owner | Decision if unmet |
|---|---|---|---|
| Access | 90% of sampled students can open the reading copy | Course lead | Fix delivery before expansion |
| Review | Every unit has a named reviewer and disposition log | Editor | Return the unit for review |
| Rights | All reused material has a recorded permission basis | Publisher | Hold publication |
| Maintenance | A correction is rebuilt from source within two working days | Source owner | Revise staffing or process |
Risks and responses
| Risk | Early signal | Response |
|---|---|---|
| Review happens only in a PDF | Comments cannot be reconciled | Send the editable Word review copy |
| Source and release diverge | A corrected figure appears only in Word | Block release until source is updated |
| Staff effort grows | More than ten hours per unit | Reduce scope and measure the cause |
| Rights are uncertain | Permission field is empty | Withhold the affected unit |
Recommendation and next decision
Approve the 16-week pilot with ten units and named owners. Review the first four units after one month, then complete the remaining six only if the workflow is stable. At the end, report the gates, actual effort, unresolved risks, and a recommendation to expand, revise, or stop. Keep the approved source and the released PDF together in the record.
Footnotes
Hours describe team effort for this example; they are not a financial quotation.↩︎